System Heating has been providing design-build/negotiated work for building owners, developers, and contractors since opening our doors in 1963. Over 95% of our projects are design-build/negotiated. Our experience spans a wide variety of projects. Types of Facilities completed include schools, retail shopping centers, office buildings and aerospace manufacturing and production facilities. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| Lincoln Corporate Park |
Lincoln Corporate Park |
General |
Acoustic / structural modifications. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| MAPSCO |
MAPSCO Seattle |
Sub-Contractor |
New construction install (2) 12,000 CFM direct gas fired makeup air to serve tank line / fume scrubber systems. Services included: Structural, HVAC, gas piping, controls, insulation, systems commissioning. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| Java Trading Co. |
Java Trading Co. |
Prime |
Install (2) process chillers to serve (4) "pod" coffee packaging systems.
Services included: New construction CHW, nitrogen and compressed air piping, instrumentation, controls, electrical, insulation and systems commissioning. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| DaVinci Gourmet, Kerry Group PLC |
DaVinci Gourmet |
Sub-Contractor |
New construction process building pressurization and ventilation to serve manufacturing plant bottling line. Services included: HVAC, gas piping, controls, insulation, systems commissioning. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| Washington Cathedral |
Washington Cathedral |
Sub-Contractor |
New construction water source heat pumps system to serve (3) story 40,000 SF mixed use worship / classroom / cafeteria / administrative office facility. More >
25 Ton package units with demand ventilation control. Pool dehumidification system to serve 2.5 story 6,000 SF indoor pool facility. Metasys DDC control system. Services included: HVACR, acoustic, CHW / HW / gas / refrigerant piping, dehumidification, DDC controls, insulation, systems commissioning. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| Open Window School |
Open Window School |
Sub-Contractor |
New construction (2) 18,000 SF 2.5 story primary school buildings. Central station air handlers providing tempered outside air to terminal units with hot water coils, DX split systems and package gas electric systems serve data, science and music labs respectively. More >
Hot water boilers and metasys control system.
Services included: HVACR, refrigeration / gas piping, controls, insulation, systems commissioning. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| E. Kent Halvorson |
True Residence |
Sub-Contractor |
A large custom home required the installation of 5-high pressure heat pump fan coil systems. All work was designed and engineered to be concealed within architectural constraints. Flush button type wall sensors were used to eliminate conventional thermostats from high visibility areas. More >
Extensive gas piping and venting was also coordinated in the design process.
|
|
|