/ 206.762.4249

Nationwide Consulting on HVAC Refurbishment 1-800-370-0568

 


industrial refurb image Over the years, our most rewarding challenge has been the upgrade and retrofit of large, penthouse-style HVAC systems. We have saved owners millions in potential capital expenses through the refurbishment of existing equipment: In many cases we have increased equipment capacity substantially. Our warranties on labor and materials exceed those provided with new equipment.

 

Client Name Job Name Prime or Sub Contractor
The Boeing Company Boeing Building 7-011 Prime

A 3-story 70,000 sq. ft. office building required the installation of a complete chilled water system. An air cooled chiller was installed on the roof including aesthetic screening, all interior piping and controls, while the building was occupied. More >

 

Client Name Job Name Prime or Sub Contractor
The Boeing Company Boeing 40-56 (5 towers) Prime

Development and implementation of a strategy for interconnecting 5 process cooling towers in order to provide redundancy. The 40-56 was one of the largest manufacturing facilities we have worked on. More >

 

Client Name Job Name Prime or Sub Contractor
The Boeing Company Boeing 18-24 Prime

Refurbishment of multiple 72,000-24,000 CFM air handling systems serving space simulation and testing laboratories, data vault and engineering offices. More >

 

Client Name Job Name Prime or Sub Contractor
The Boeing Company Boeing 4-20 Prime

Refurbish 40,000 CFM air handler serving assembly building. Replace 100lb steam coil bank, supply and condensate piping, supply fan motor and drives, upgrade controls, replace insulation, encapsulate interior air tunnel. More >

 

Client Name Job Name Prime or Sub Contractor
The Boeing Company Boeing 3-390 Prime

Convert existing airside / CHW / HW / steam pneumatic control system to direct digital control and integrate with site-wide CMCS systems. Replace motors / drives and install new variable frequency drives on (7) central supply / return fan systems totaling 157,000 CFM. More >

 

Client Name Job Name Prime or Sub Contractor
Amgen Amgen Building 29 Prime

Prefab chilled and hot water piping and instrumentation service (5) pace 100,000 CFM air handling units for installation in factory prior to shipping Services included: Piping, instrumentation

 

Client Name Job Name Prime or Sub Contractor
Chiron Life Sciences Chiron Life Sciences Prime

Prefab chilled and hot water piping and instrumentation service (3) pace 100,000 CFM air handling units for installation in factory prior to shipping Services included: Piping, instrumentation