Over the years, our most rewarding challenge has been the upgrade and retrofit of large, penthouse-style HVAC systems. We have saved owners millions in potential capital expenses through the refurbishment of existing equipment: In many cases we have increased equipment capacity substantially. Our warranties on labor and materials exceed those provided with new equipment. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| The Boeing Company |
Boeing Building 7-011 |
Prime |
A 3-story 70,000 sq. ft. office building required the installation of a complete chilled water system. An air cooled chiller was installed on the roof including aesthetic screening, all interior piping and controls, while the building was occupied. More >
A section of the roof was removed for structural additions and a temporary roof structure erected over the area to allow work to continue during the winter schedule.
|
| Client Name |
Job Name |
Prime or Sub Contractor |
| The Boeing Company |
Boeing 40-56 (5 towers) |
Prime |
Development and implementation of a strategy for interconnecting 5 process cooling towers in order to provide redundancy. The 40-56 was one of the largest manufacturing facilities we have worked on. More >
The cooling towers served a series of large industrial press systems responsible for production of products for the dream-liner assembly. Towers were located on different roof elevations and hundreds of feet apart in some cases. Repairs to cooling towers were phased over holidays and weekend shutdowns each with critical schedules. Major piping, electrical, filtration, and related equipment revisions and designs are underway at this facility to enable redundancy and flexibility of tower operations.
|
| Client Name |
Job Name |
Prime or Sub Contractor |
| The Boeing Company |
Boeing 18-24 |
Prime |
Refurbishment of multiple 72,000-24,000 CFM air handling systems serving space simulation and testing laboratories, data vault and engineering offices. More > Rebuild and replace supply and return fans, fan wheels, replace CHW, pre-heating and hot water banks, replace and upgrade steam humidifier banks, replace and upgrade damper and filter banks. Services included: General construction, hazardous materials abatement, HVACR, piping, instrumentation, controls, structural, electrical, coatings, insulation and systems commissioning.
|
| Client Name |
Job Name |
Prime or Sub Contractor |
| The Boeing Company |
Boeing 4-20 |
Prime |
Refurbish 40,000 CFM air handler serving assembly building. Replace 100lb steam coil bank, supply and condensate piping, supply fan motor and drives, upgrade controls, replace insulation, encapsulate interior air tunnel. More >
Services included: General construction, hazardous materials abatement, steam piping, instrumentation, controls, electrical, coatings, insulation, systems commissioning
|
| Client Name |
Job Name |
Prime or Sub Contractor |
| The Boeing Company |
Boeing 3-390 |
Prime |
Convert existing airside / CHW / HW / steam pneumatic control system to direct digital control and integrate with site-wide CMCS systems. Replace motors / drives and install new variable frequency drives on (7) central supply / return fan systems totaling 157,000 CFM. More >
Services included: General construction, hazardous materials abatement, motors / drives, pumps / CHW / HW/ steam piping, instrumentation, DDC controls, electrical, insulation, control systems commissioning
|
| Client Name |
Job Name |
Prime or Sub Contractor |
| Amgen |
Amgen Building 29 |
Prime |
Prefab chilled and hot water piping and instrumentation service (5) pace 100,000 CFM air handling units for installation in factory prior to shipping Services included: Piping, instrumentation |
| Client Name |
Job Name |
Prime or Sub Contractor |
| Chiron Life Sciences |
Chiron Life Sciences |
Prime |