Every replacement project brings a unique set of challenges. We have developed cost effective and safe methods for replacement of large HVAC systems serving a wide range of applications. From hi-rise buildings to critical facilities, our planning and delivery methods will maximize the efficiency and savings on your next replacement. |
| Client Name |
Job Name |
Prime or Sub Contractor |
| The Boeing Company |
Boeing 15-10 |
Prime |
Retrofit and install new rooftop air handling unit on nuclear particle accelerator laboratory building, structural steel fabrication and installation, convert existing pneumatic airside controls to DDC, integrate with VAV terminal units and building CMCS systems, and upgrade electrical service at facility substation. More >
Services Included: general construction, structural, hazardous materials abatement, instrumentation, ddc controls, electrical, insulation, control systems commissioning |
| Client Name |
Job Name |
Prime or Sub Contractor |
| The Boeing Company |
Boeing 18-41 |
Prime |
Replace 50,000 CFM dew point supply fan (DPSF) to multiple air handling systems totaling 335,850 CFM that serve high bay clean room & test facilities. Functional components of new DPSF include fanwall supply fan section, pre-heat and hot water coil section, air washer, chilled coil section, dx coil section including remote condensing units. More >
Services Included: general construction, hazardous materials abatement, HVACR, piping, instrumentation, controls, structural, electrical, coatings, insulation, systems commissioning |
| Client Name |
Job Name |
Prime or Sub Contractor |
| City of Tacoma |
Tacoma Municipal Building |
Prime |
Provided turnkey fluid cooler replacement on the Tacoma Municipal Building during weekend shutdown. Our team has experience with turnkey installations on short schedules. More >
This project included substantial structural modifications and included piping, electrical and control work on critical path weekend shutdown schedule at 220’ feet on unprotected rooftop. |

|
| Client Name |
Job Name |
Prime or Sub Contractor |
| Valley Medical |
Valley Medical |
Prime |
Performed turnkey replacement installation of BAC cooling tower over a short time span. Replaced unit over weekend shutdown, work included electrical, piping and controls on roof of medical office building.
|
|
|